Home
Current Contracts
Sea Defence Blackpool
Sea Defence Cleveleys
WTW Leigh
Appartments Salford
Floating Dock Liverpool
Health & Safety
Directions
 
 


This is a shelter on the sea front at Cleveleys. The seats were made at SLP Precast and the roof slab was cast insitu. All the steelfixing was carried out by (Craig Barnes Ltd Steelfixing Services).


This is a lampost cage just about to be put into the mould at the SLP Precast yard in Thornton. The lampost cage, made from stainless and carbon rebar, was cast upside down. This was quite complex steelfixing.


This is the lampost after it had been cast, now the right way up. When it goes to site it will be put into position and the stainless steel lighting attachment will be fitted.

  
Top