Floating Dock - Liverpool

Another one of our contracts we have nearly complete is 900 ton of rebar for a floating dock at Liverpool Docks for G.C.L and Balfour Beatty.


This is the the base for the floating dock.

Base Of Floating Dock
Base Of Floating Dock