Water Treatment Works - Leigh

All the Steel Fixing on these two water tanks was carried out by CBL Steel Fixers for GCL.  The reinforcement in the base and the walls of tanks was mainly mesh with a ring beam made from rebar.

leigh1
leigh1
leigh2
leigh2